SBA Small Business · HUBZone · SDVOSB Certified
573-624-5277 Employee Portal ↗
RKE Contractors Request a Bid Package
RKE Contractors
About Capabilities Projects News Careers Contact Employee Portal ↗
Request a Bid Package → CALL 573-624-5277
Our Projects
Home / Projects

Our Projects

Four decades of federal and civil work — filter by the type of work, not the paperwork.

A Portfolio Built on Performance

Building the Foundations of America: Rigid Infrastructure Proven on Site

The infrastructure we build does more than serve today's needs—it strengthens our nation for generations to come. At RKE, we're proud to build projects that protect communities, strengthen our economy, and fuel national growth. Every bridge, levee, road, floodwall, and cemetery is a commitment to quality, durability, and the future generations that will depend on it.

Browse our work by capability or customer below.

7 PROJECTS
Cache River Culvert Repairs Levee, Flood Control & Water Resources
Cache River Culvert Repairs
U.S. Army Corps of Engineers
Memphis District · $1,295,443 · Completed 2024
Ditch 251 Channel Cleanout Levee, Flood Control & Water Resources
Ditch 251 Channel Cleanout
U.S. Army Corps of Engineers
Pemiscot & New Madrid County, Missouri · $9,100,179 · Completed 2023
Belle Fountain Ditches Cleanout Levee, Flood Control & Water Resources
Belle Fountain Ditches Cleanout
U.S. Army Corps of Engineers
Caruthersville, Missouri · $2,740,918
Cape Girardeau Floodwall Toe Drain Replacement Levee, Flood Control & Water Resources
Cape Girardeau Floodwall Toe Drain Replacement
U.S. Army Corps of Engineers
Cape Girardeau, Missouri · $1,440,501 · Completed 2016
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair Levee, Flood Control & Water Resources
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair
U.S. Army Corps of Engineers
Le Flore County, Oklahoma · $4,637,335 · Completed 2025
Clarence Cannon Dam Flood Repair Levee, Flood Control & Water Resources
Clarence Cannon Dam Flood Repair
U.S. Army Corps of Engineers
Monroe City, Missouri · $6,265,620 · Completed 2011
DVA Waterline Relocation – St. Louis, MO Site Utilities & Underground
DVA Waterline Relocation – St. Louis, MO
U.S. Army Corps of Engineers
St. Louis, Missouri (John J. Cochran VA Hospital) · $13,393,847 · In Progress
Performance Feedback

What Our Customers Are Saying

Fort Gibson National Cemetery Construct Columbarium

Thanks again for you and your teams’ work on this final phase of the project and we look forward to working together on future construction projects. NCA is grateful for RKE’s attention to detail, and quality of work on our National Shrine and honoring our Veterans.
Contract Specialist, Dept. of Veterans Affairs - National Cemetery Administration Department of Veterans Affairs

JB CFM

I could go on and on about RKE exceptional overall performance, scheduling abilities, technical proficiency, and ability to control costs. RKE properly staffs the project with knowledgeable and motivated onsite field personnel and off-site project management personnel align the documentation with their suppliers and construction forces. This contractor can self-perform work as needed as well as manage multiple specialty subcontractors and suppliers through each phase of construction. In addition, RKE has great communication and coordination skills which are key in both a fast-moving construction site that is closed to the public and coordinating phased work on or adjacent to an active VA medical center that is open to the public, where public access must be safely maintained during the entire construction project duration. I highly recommend RKE for your next project.
Senior Resident Engineer, VA-CFM Department of Veterans Affairs
Read All Reviews →

Start Your Project With RKE