SBA Small Business · HUBZone · SDVOSB Certified
573-624-5277 Employee Portal ↗
RKE Contractors Request a Bid Package
RKE Contractors
About Capabilities Projects News Careers Contact Employee Portal ↗
Request a Bid Package → CALL 573-624-5277
Our Projects
Home / Projects

Our Projects

Four decades of federal and civil work — filter by the type of work, not the paperwork.

A Portfolio Built on Performance

Building the Foundations of America: Rigid Infrastructure Proven on Site

The infrastructure we build does more than serve today's needs—it strengthens our nation for generations to come. At RKE, we're proud to build projects that protect communities, strengthen our economy, and fuel national growth. Every bridge, levee, road, floodwall, and cemetery is a commitment to quality, durability, and the future generations that will depend on it.

Browse our work by capability or customer below.

15 PROJECTS
Jefferson Barracks National Cemetery – Phase 5C Expansion Earthwork & Site Development
Jefferson Barracks National Cemetery – Phase 5C Expansion
Department of Veterans Affairs
St. Louis, MO · $20.3M · Completed 2024
New State Veterans Cemetery – Ardmore, OK (Crypt Installation) Concrete & Structural
New State Veterans Cemetery – Ardmore, OK (Crypt Installation)
Ardmore, Oklahoma
Fort Gibson National Cemetery – Gravesite Expansion Earthwork & Site Development
Fort Gibson National Cemetery – Gravesite Expansion
Department of Veterans Affairs
Fort Gibson, Oklahoma · $4,860,613 · Completed 2021
Mill Springs National Cemetery Expansion Earthwork & Site Development
Mill Springs National Cemetery Expansion
Nancy, Kentucky
Cache River Culvert Repairs Levee, Flood Control & Water Resources
Cache River Culvert Repairs
U.S. Army Corps of Engineers
Memphis District · $1,295,443 · Completed 2024
Ditch 251 Channel Cleanout Levee, Flood Control & Water Resources
Ditch 251 Channel Cleanout
U.S. Army Corps of Engineers
Pemiscot & New Madrid County, Missouri · $9,100,179 · Completed 2023
Horton Slough Trail – Pedestrian Bridge Concrete & Structural
Horton Slough Trail – Pedestrian Bridge
Federal Highway Administration
Vian, Oklahoma (Sequoyah National Wildlife Refuge) · $1,203,001 · Completed 2022
Belle Fountain Ditches Cleanout Levee, Flood Control & Water Resources
Belle Fountain Ditches Cleanout
U.S. Army Corps of Engineers
Caruthersville, Missouri · $2,740,918
Cape Girardeau Floodwall Toe Drain Replacement Levee, Flood Control & Water Resources
Cape Girardeau Floodwall Toe Drain Replacement
U.S. Army Corps of Engineers
Cape Girardeau, Missouri · $1,440,501 · Completed 2016
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair Levee, Flood Control & Water Resources
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair
U.S. Army Corps of Engineers
Le Flore County, Oklahoma · $4,637,335 · Completed 2025
Clarence Cannon Dam Flood Repair Levee, Flood Control & Water Resources
Clarence Cannon Dam Flood Repair
U.S. Army Corps of Engineers
Monroe City, Missouri · $6,265,620 · Completed 2011
DVA Waterline Relocation – St. Louis, MO Site Utilities & Underground
DVA Waterline Relocation – St. Louis, MO
U.S. Army Corps of Engineers
St. Louis, Missouri (John J. Cochran VA Hospital) · $13,393,847 · In Progress
Jefferson Barracks National Cemetery – Phase 5 A & B Expansion Earthwork & Site Development
Jefferson Barracks National Cemetery – Phase 5 A & B Expansion
Department of Veterans Affairs
St. Louis, Missouri · $13,404,320 · Completed 2021
Fort Sam Houston National Cemetery – Phase 3 Expansion Earthwork & Site Development
Fort Sam Houston National Cemetery – Phase 3 Expansion
Department of Veterans Affairs
San Antonio, Texas · $54,096,194 · Completed 2025
Sikeston Substation Fencing Replacement Earthwork & Site Development
Sikeston Substation Fencing Replacement
U.S. Department of Energy
Sikeston, Missouri · $430,605 · Completed 2022
Performance Feedback

What Our Customers Are Saying

John Cochran Building 29 Demo

Their Quality Control program is exceptional and meets the contract requirements without needless rework or confusion before each activity. They set the bar early and often to make sure the project provides the quality required in the contract documents.
Contracting Officer, Dept. of Veterans Affairs Department of Veterans Affairs

JB 5AB

They set the bar early with their subcontractors and suppliers and follows up through the end of the construction and turnover process.

If I were to select a contractor based on qualifications, RKE would be my first choice based on their performance on the Jefferson Barrack National Cemetery expansion phase 5 A & B. I highly recommend RKE for your next construction project. RKE provides great customer service as they are always available when needed and proactive in their communication. They welcome feedback and questions in the field and their response are always positive and to the point.
Contracting Officer, Dept. of Veterans Affairs Department of Veterans Affairs
Read All Reviews →

Start Your Project With RKE